D-63 Licensed · ADU Site Prep

ADU Site Prep & Demolition in San Diego

Before your ADU goes up, the old garage, shed, or deck has to come down. One D-63 licensed crew tears it down, breaks out the slab, hauls every scrap, and hands your builder a clean, build-ready pad.

D-63Licensed Demo
4.7 ★Average Rating
BondedLicensed & Insured

We Clear the Site So Your ADU Can Start

ADU permits across San Diego County have roughly tripled since 2020 — and almost every one of those builds starts by removing what's standing in the way. That's exactly what we do.

🏭

Shed & Outbuilding Removal

  • Wood & metal sheds
  • Gazebos, pergolas & playsets
  • Old workshops & granny structures
  • Removal from $300–$500
🔳

Concrete & Slab Removal

  • Garage & shed slab break-out
  • Patios, walkways & flatwork
  • Footing & stem wall removal
  • Or slab left intact — per your plan
🚛

Site Clearing & Haul-Off

  • Decks, fencing & retaining walls
  • Overgrowth & yard waste
  • Stored junk & clutter removal
  • Grade-clean handoff to your builder

✓ D-63 Licensed — Post Construction & Demolition Cleanup | CA Contractor #1135398

From Standing Structure to Build-Ready Pad

One call, one crew, one clean site — before your foundation crew ever shows up.

1

Scope & Quote

Send us photos or your site plan. We confirm what's coming down — structure, slab, fencing, clearing — and give you one upfront, all-inclusive price.

2

Demo Day

Once utilities are disconnected, our licensed crew tears the structure down safely, protecting fences, trees, and neighboring property.

3

Clean-Pad Handoff

Every scrap of debris gets loaded and hauled the same job. Your builder walks onto a grade-clean site, ready for layout and foundation work.

Upfront Pricing
D-63 Licensed
Bonded & Insured
Build-Ready Handoff

Your Demo Sub for Every ADU Project

Building ADUs across San Diego County? Stop piecing together demo, hauling, and disposal for every job. We handle the whole teardown phase as one subcontracted line item.

📅

Scheduled Demo Windows

  • Demo dates locked to your build schedule
  • Same-week availability on most jobs
  • One point of contact, direct line
📋

Paperwork Ready

  • CA Contractor #1135398, D-63 certified
  • Certificate of insurance on request
  • Bonded & insured on every site
🤝

One Line Item

  • Teardown + haul-off + disposal in one price
  • No dumpster rentals or separate dump fees
  • Grade-clean handoff, photo-documented
Partner With Us on Your Next Build

ADU Demolition FAQs

Common questions about tearing down structures for an ADU build in San Diego.

Do I need a permit to demolish my garage for an ADU in San Diego?

Demolishing a detached garage or any structure over 120 square feet generally requires a demolition permit in San Diego. When the teardown is part of a permitted ADU project, demolition is often handled within the project's permit package — we coordinate directly with your builder or designer so nothing falls through the cracks.

Can you remove the concrete slab, or leave it for the new foundation?

Either. Most ADU designs call for a new engineered foundation, in which case we break out the old slab and haul it away. If your builder's plan reuses or works around the existing flatwork, we demo the structure and leave the slab intact. We follow whatever your plan set specifies.

How long does garage demolition take?

Most single- and two-car garage teardowns take one to two days including full debris haul-off. Slab removal, access constraints, or attached utilities can add time — we give you a realistic timeline with your upfront quote.

How much does ADU site prep cost in San Diego?

It depends on what's coming down. Shed removals typically start at $300–$500 and deck demolitions run $400–$800. Garage teardowns are quoted by size, slab scope, and access. Every quote is free, upfront, and all-inclusive — demolition, labor, hauling, and disposal in one number.

What about utility disconnects to the garage?

Power, gas, and water serving the structure must be safely disconnected before demolition begins. We coordinate the demo date around your disconnect schedule and confirm the site is safe before the first swing.

Do you work directly with ADU builders and designers?

Yes. We subcontract demolition and site clearing for ADU builders, designers, and general contractors across San Diego County — scheduled demo windows, certificate of insurance on request, and one line item that covers teardown, haul-off, and disposal.

Planning your build? Read our guides on garage demolition for an ADU and the ADU site prep checklist, or see our full demolition services.

Get a Free ADU Demo Quote

Tell us what's on the site now — or have your builder send the plan. We typically reply within the hour during business hours. Texting a few photos is fastest.

4.7 · 26 Google reviews

“Their team showed up on time...they were polite and very efficient. The price was very fair.” — Fred Bates

💬
Text or Call(619) 841-4193
🕐
HoursMon–Sat: 8am – 7pm
Sun: Closed

No credit card required. We typically reply within the hour during business hours (Mon–Sat 8am–7pm).

📞 Call Us Get Quote